UD J08 Cylinder Head Overhaul/Replacement & Torque Sequence 2008-2010

$50.00

tt_admin

2012-12-18

Description

This is a 10 page PDF file covering 2008-2010 J08E-TV-TW. This is a step by step procedure for cylinder head overhaul

File Contents:

  • Removing and installing cylinder head
  • Disassemble & assemble valve system
  • Valve guide replacement
  • Machining valves and seats
  • Replacing injector nozzle seats (cups)
  • Cam timing
  • Critical torque specifications
Print

Reviews

There are no reviews yet.

Be the first to review “UD J08 Cylinder Head Overhaul/Replacement & Torque Sequence 2008-2010”